<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Haynes Whaley Associates &#187; Progressive Collapse</title>
	<atom:link href="http://hwablog.com/blog/tag/progressive-collapse/feed/" rel="self" type="application/rss+xml" />
	<link>http://hwablog.com/blog</link>
	<description></description>
	<lastBuildDate>Tue, 31 Aug 2010 22:06:01 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.8.4</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Patriots Plaza II &amp; III – Largest Speculative Office Project in DC to be Awarded LEED Gold</title>
		<link>http://hwablog.com/blog/2010/06/patriots-plaza-ii-iii-%e2%80%93-largest-speculative-office-project-in-dc-to-be-awarded-leed-gold/</link>
		<comments>http://hwablog.com/blog/2010/06/patriots-plaza-ii-iii-%e2%80%93-largest-speculative-office-project-in-dc-to-be-awarded-leed-gold/#comments</comments>
		<pubDate>Mon, 14 Jun 2010 14:49:20 +0000</pubDate>
		<dc:creator>Craig Myers</dc:creator>
				<category><![CDATA[HaynesWhaley]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[DC]]></category>
		<category><![CDATA[GSA]]></category>
		<category><![CDATA[Haynes Whaley]]></category>
		<category><![CDATA[LEED]]></category>
		<category><![CDATA[Progressive Collapse]]></category>
		<category><![CDATA[structural engineer]]></category>
		<category><![CDATA[Washington DC]]></category>

		<guid isPermaLink="false">http://hwablog.com/blog/?p=714</guid>
		<description><![CDATA[
Patriots Plaza II and III, located in the heart of Southwest Washington, DC, have been awarded LEED Core &#38; Shell Gold Certification, making them part of the largest speculative office project in the District to receive a LEED Gold rating. Haynes Whaley’s engineers collaborated with the project team, including Trammell Crow Company, Gensler, B&#38;A Consulting [...]]]></description>
			<content:encoded><![CDATA[<div class="mceTemp">
<div id="attachment_734" class="wp-caption alignleft" style="width: 310px"><img class="size-medium wp-image-734" title="PatriotsII&amp;III-5_small" src="http://hwablog.com/blog/wp-content/uploads/2010/06/PatriotsIIIII-5_small3-300x292.jpg" alt="© Maxwell MacKenzie 2009" width="300" height="292" /><p class="wp-caption-text">© Maxwell MacKenzie 2009</p></div>
<p>Patriots Plaza II and III, located in the heart of Southwest Washington, DC, have been awarded LEED Core &amp; Shell Gold Certification, making them part of the largest speculative office project in the District to receive a LEED Gold rating. Haynes Whaley’s engineers collaborated with the project team, including Trammell Crow Company, Gensler, B&amp;A Consulting Engineers, and Helix Constructors, to design a facility that meets new government security standards, is marketable to private sector tenants, minimizes the impact to the environment and is energy efficient. Patriots Plaza II and III perform 14% better than ASHRAE 9.1, utilized over 20% of recyclable and regional building materials, and recycled more than 80% of the construction waste.</p></div>
<p>Patriots Plaza is a three-phase, 1 million sf office complex that is more than 80% leased by the General Services Administration for multiple U.S. Government agencies, including the FBI, FEMA, Health and Human Services, and the U.S. Department of Agriculture. Our engineers provided structural design services for the entire complex, which was the first market-driven urban complex designed to meet post 9/11 security standards for a Level IV facility. Patriots Plaza’s high security features include progressive collapse avoidance, a hardened structure to resist blast loading, special column designs in the below-grade parking garage, and intricate detailing of reinforcement to increase the ability of the structure to confine damage and withstand attack.</p>
]]></content:encoded>
			<wfw:commentRss>http://hwablog.com/blog/2010/06/patriots-plaza-ii-iii-%e2%80%93-largest-speculative-office-project-in-dc-to-be-awarded-leed-gold/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>NBACC Featured in Gilbane&#8217;s &#8220;Bulletin&#8221;</title>
		<link>http://hwablog.com/blog/2009/06/nbacc-featured-in-gilbanes-bulletin/</link>
		<comments>http://hwablog.com/blog/2009/06/nbacc-featured-in-gilbanes-bulletin/#comments</comments>
		<pubDate>Tue, 30 Jun 2009 14:24:54 +0000</pubDate>
		<dc:creator>Chris Vadala</dc:creator>
				<category><![CDATA[Articles]]></category>
		<category><![CDATA[HaynesWhaley]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[BSL-4]]></category>
		<category><![CDATA[cast-in-place concrete]]></category>
		<category><![CDATA[Haynes Whaley]]></category>
		<category><![CDATA[Progressive Collapse]]></category>

		<guid isPermaLink="false">http://hwablog.com/blog/?p=316</guid>
		<description><![CDATA[
Haynes Whaley&#8217;s latest Biosafety Level 4 (BSL-4) laboratory project was recently featured in the Spring 2009 edition of Gilbane Construction&#8217;s &#8220;Bulletin&#8221;.  Our firm provided the structural engineering services for the National Biodefense Analysis and Countermeasures Center (NBACC) at Fort Detrick, Maryland.  This recently completed project was the first new facility built for the Department of Homeland [...]]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.gilbanebuilding.com/news/pdf/Gilbane_Spring_2009.pdf"><img class="size-medium wp-image-321 alignleft" title="Gilbane Bulletin Spring 2009" src="http://hwablog.com/blog/wp-content/uploads/2009/06/img-629131433-0001-212x300.jpg" alt="img-629131433-0001" width="149" height="195" /></a></p>
<p>Haynes Whaley&#8217;s latest Biosafety Level 4 (BSL-4) laboratory project was recently featured in the Spring 2009 edition of Gilbane Construction&#8217;s &#8220;Bulletin&#8221;.  Our firm provided the structural engineering services for the National Biodefense Analysis and Countermeasures Center (NBACC) at <a href="http://www.detrick.army.mil/" target="_blank">Fort Detrick</a>, Maryland.  This recently completed project was the first new facility built for the Department of Homeland Security.  Along with <a href="http://www.gilbanebuilding.com/" target="_blank">Gilbane Construction</a>, we worked with<a href="http://www.perkinswill.com/" target="_blank"> Perkins + Will </a>(Atlanta and Houston), <a href="http://www.aeieng.com/" target="_blank">Affiliated Engineers, Inc</a>., <a href="http://www.ccrd.com/" target="_blank">ccrd partners</a>, and other national firms on this critical project.  The mission of this facility is to serve as the lead lab with the FBI and other law enforcement agencies in the event of a bioterrorist attack on this country.</p>
<p>This was Haynes Whaley&#8217;s third BSL-4 project.  Our previous experience with the unique construction requirements for high-containment lab areas was a great benefit to this effort.  As an example, we were able to reduce the concrete curing requirements for the concrete containment walls based upon our experience with the two previous projects.  NBACC presented many other unique structural design challenges, including the ability to resist progressive collapse and the use of a micropile foundation system.</p>
]]></content:encoded>
			<wfw:commentRss>http://hwablog.com/blog/2009/06/nbacc-featured-in-gilbanes-bulletin/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Sentinel Square-Phase I:  Sustainable &amp; Secure</title>
		<link>http://hwablog.com/blog/2009/06/sentinel-square-phase-i-sustainable-secure/</link>
		<comments>http://hwablog.com/blog/2009/06/sentinel-square-phase-i-sustainable-secure/#comments</comments>
		<pubDate>Thu, 11 Jun 2009 20:54:58 +0000</pubDate>
		<dc:creator>Renee Meador</dc:creator>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[cast-in-place concrete]]></category>
		<category><![CDATA[GSA]]></category>
		<category><![CDATA[LEED]]></category>
		<category><![CDATA[precast concrete]]></category>
		<category><![CDATA[Progressive Collapse]]></category>
		<category><![CDATA[USGBC]]></category>
		<category><![CDATA[Washington DC]]></category>

		<guid isPermaLink="false">http://hwablog.com/blog/?p=144</guid>
		<description><![CDATA[The topping out of Sentinel Square-Phase I was celebrated today.  This downtown Washington, D.C. project is a Class A 12-story, 413,000 sf office building with three levels of below-grade parking, located at 90 K Street, NE in the revitalized NoMa (North of Massachusetts Avenue) corridor.  The project is registered with the USGBC, with the goal of obtaining LEED [...]]]></description>
			<content:encoded><![CDATA[<p><img class="size-medium wp-image-249 alignleft" title="Sentinel Square Phase I" src="http://hwablog.com/blog/wp-content/uploads/2009/06/sentinel-square-phase-i1-300x233.jpg" alt="Sentinel Square Phase I" width="300" height="233" />The topping out of Sentinel Square-Phase I was celebrated today.  This downtown Washington, D.C. project is a Class A 12-story, 413,000 sf office building with three levels of below-grade parking, located at 90 K Street, NE in the revitalized NoMa (North of Massachusetts Avenue) corridor.  The project is registered with the USGBC, with the goal of obtaining LEED Silver certification.  Haynes Whaley worked with the project team to utilize numerous sustainable design elements and construction methods, including designing and sp<img class="alignright size-medium wp-image-255" title="Sentinel Square Frame" src="http://hwablog.com/blog/wp-content/uploads/2009/06/sentinel-square-frame1-300x225.jpg" alt="Sentinel Square Frame" width="180" height="135" />ecifying structural systems utilizing recycled materials.  The cast-in-place concrete structure was designed to meet the GSA security requirements for a Medium Level of Protection (MLOP) including provisions to resist progressive collapse.  Precast concrete, stainless steel metal panels and black granite are used on the building’s exterior.  An interesting note:  the 2-story lobby is adorned with gold marble from Israel.</p>
<p>Haynes Whaley was the engineer of record for the project which also included Developer: <a href="http://www.trammellcrow.com" target="_blank">Trammell Crow Company</a>; Architect: <a href="http://www.smithgroup.com" target="_blank">SmithGroup</a>; and Contractor: <a href="http://www.clarkconstruction.com" target="_blank">Clark Construction</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://hwablog.com/blog/2009/06/sentinel-square-phase-i-sustainable-secure/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
